Sepulveda Connects

About

Sepulveda Connects is a City project to design and build transit priority and other mobility improvements on the Sepulveda Boulevard corridor within Culver City. The project is currently in conceptual design.

Proposed Designs

There are three proposed design alternatives. Each alternative presents a different way of achieving transit priority while balancing impacts to existing uses like traffic and parking. 

View cross-sections of the proposed designs.(PDF, 12MB)

View the conceptual plan for Alternative 1.(PDF, 9MB)

View the conceptual plan for Alternative 2.(PDF, 9MB)

View the conceptual plan for Alternative 3.(PDF, 9MB)

Sunkist Park Traffic Calming

The City Council has directed staff to pursue solutions to existing cut-through traffic issues in the Sunkist Park neighborhood as part of Sepulveda Connects. To accomplish this, the project team has collected data on traffic and parking in Sunkist Park and prepared some possible design treatments.

Controlling Cut-Through Traffic

Segrell Way was identified as the focus for cut-through traffic reduction for three reasons:

  • Traffic counts indicated that Segrell Way experiences disproportionate cut-through traffic.
  • A traffic model of the proposed Sepulveda Connects concept design alternatives found that cut-through traffic on Segrell may increase slightly under all three alternatives if no action is taken to mitigate it. No significant impacts were found for any other local streets.
  • The majority of public comments about cut-through traffic from the February 17, 2026 meeting also focus on Segrell and the alley between Segrell and Sepulveda. 

Project staff returned to the Community on June 17, 2026. Based on comments from attendees, staff have continued to study design alternatives to reduce cut-through traffic. This includes cul-de-sacs on select streets in Sunkist Park.

Staff propose to reduce cut-through traffic on Segrell by using cul-de-sacs to prevent through-traffic on Segrell Way and Culver Park Drive, where the two streets meet Slauson Avenue. The diagram below shows an example cul-de-sac on Segrell Way. This would prevent vehicle traffic from accessing Segrell Way and Culver Park Drive from Slauson Avenue. Vehicles on Segrell Way and Culver Park Drive also could not access Slauson Avenue. Pedestrian access would be maintained.

An overhead map that shows a drawing of a cul-de-sac on Segrell Way at the intersection of Slauson Avenue. The drawing shows a circle with a 15 foot, 5 inch diameter example size for a cul-de-sac, with green spaces showing where curb and raised planters would be constructed to prevent car traffic. There is a crosswalk shown that indicates where pedestrian access would continue along Slauson.

 

You can see the data and more information about the proposed cul-de-sacs here.(PDF, 22MB)

Staff previously proposed to reduce cut-through traffic on Segrell by building traffic diverters. These are physical barriers, similar to concrete medians, that prevent cars from turning left or going straight through an intersection. The diagram below shows the three proposed diverters at the intersections with Culver Park Drive, Segrell Way, and the alley. The arrows show how cars would exit the three streets with diverters.

An overhead map of Berryman Ave, showing traffic diverters at the intersections with Culver Park Drive, Segrell Way, and the alley. Arrows show that cars turning off of these three streets would only be able to turn right.

 

This would prevent cars from using Segrell or the alley to cut through from Sawtelle to Sepulveda. A diverter was also proposed for Culver Park Drive to avoid cut-through traffic using Culver Park instead of Segrell. Constructing a diverter would affect access for residents. While it would still be possible for residents to enter and exit their neighborhoods by car, approaching from certain directions might require taking a slightly longer route.

You can see the data and more information about the previously proposed diverters here.(PDF, 2MB)

Improving Pedestrian Crossings

Most comments from residents focused on the intersection of Sepulveda Boulevard and Sawtelle Boulevard. To improve the crossing experience at this intersection, staff recommend extending the curb by narrowing the corner radius.

Curb extensions narrow roadways by extending the sidewalk at corners into the intersection. For drivers, the right turning path becomes tighter, forcing cars to slow down and pay attention to pedestrians in the crosswalk. For pedestrians, the total crossing distance becomes shorter. 

Diagram depicting a street corner with a reduced radius, showing how the turn becomes tighter.

 

Improving Pedestrian Crossings

A concrete median along Slauson Avenue is an alternative to restrict cut-through traffic. This concrete median could be constructed in the center of Slauson Avenue and restrict left turn movements to and from Segrell Way and Culver Park Drive. The median would only allow for right turns in and out of Segrell Way and Culver Park Drive to and from Slauson Avenue.

 

Project Goals


 
ADA transportation


 Provide travel options that work for all, including seniors, children, families, and people who don't drive.

 
truck inside clock
  
 Get people where they need to go, on time, no matter how they travel and what time of day.


checklist
  
 Plan ahead to ensure residents and workers have reliable travel options as our community grows.


badge check
 


 Ensure all travelers are safe and respected on Culver City streets, including our most vulnerable residents. 


 
boxtruck
   


 Support the city’s economy and local businesses, by ensuring customers, workers, and deliveries have easy access to   businesses and employment centers.


woman and child biking
 


 Combat climate change, by moving quickly to build infrastructure that invites walking, biking, and transit use.


 
multimodal


 Make transit, walking, and biking great options that are equally comfortable and viable as driving. 


road.png


 Balance the uses of our limited street space to ensure space-efficient modes like transit and cycling are safe and reliable. 


thumbs up
 Build trust through transparent decision-making and community input into design solutions.



 


Timeline

Existing Conditions and Opportunities Analysis
January - November 2025 - Complete

Traffic Analysis and Modeling
July 2025 - January 2026 - Complete (see the projected traffic impacts for each alternative)

City Council considers Guiding Principles
October 27, 2025 - Complete

Public Outreach and Conceptual Design
Fall 2025 - Winter 2026 - Ongoing (see the proposed designs)

Final Design and Pre-Construction
Summer - Winter 2026/2027

Construction Starts
Spring 2027


Get Involved

Learn more about Sepulveda Connects at one of our public events or view our Storymap for Sunkist Park.

Date Event
October 27, 2025 City Council Meeting - Guiding Principles
November 17, 2025 Design Workshop #1
February 17, 2026 Sunkist Park Design Open House
February 26, 2026 Design Workshop #2
March 18, 2026 Design Workshop #3
March 21, 2026 Sunkist Park Virtual Design Open House
March 31, 2026 Mobility Subcommittee
April 2, 2026 Design Workshop #4
April 16, 2026 Design Workshop #5
 June 17, 2026 Sunkist Park Design Meeting (June)
 October 7, 2026 Sunkist Park Design Meeting (October)

 

Project Files and Documents